Skip to content

Latest commit

 

History

5 Commits

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 

Repository files navigation

AI-Powered Data Analysis

CODED × Al-Khafji Joint Operations (KJO)

Three days, six hours a day, at the Arabella Hotel. Fifteen participants from Finance, Planning, HR and Operations.

This repository holds the participant-facing site only. It is a static site with no build step and no backend.

What is here

Page URL
Programme hub /
Day 1 · Working With AI on Real Data /coded-ada-day-1
Day 2 · From Data to Insight /coded-ada-day-2
Day 3 · From Analysis to Recommendation /coded-ada-day-3
Slide decks /coded-ada-day-{1,2,3}-deck
Fillable workbooks /coded-ada-day-{1,2,3}-workbook
Datasets /work-orders-40.xlsx, /work-orders-full.xlsx, /capstone-service-requests.xlsx

What is deliberately NOT here

The facilitator scripts, the answer keys, the capstone answer key and the eight-claims answers stay out of this repository. This repo is public, and those files give away every reveal the three days are built on: Day 1's correct answer, Day 2's rank flip, Day 3's Industrial Branch trap and the SR-4885 collision. Publishing them would spoil the workshop for anyone who looks.

They live with the delivery team, in FOR-INSTRUCTOR/.

Deploying

Static, no build step. Vercel serves public/ as configured in vercel.json.

vercel --prod

Or connect the repository in the Vercel dashboard. Framework preset: Other. No build command. Output directory: public.

cleanUrls is on, so /coded-ada-day-1.html redirects to /coded-ada-day-1. Internal links use the .html form and are redirected, so both work.

Workbook data

The workbooks save what participants type to localStorage in their own browser, per day, under ada_workbook_1|2|3. Nothing is sent anywhere, there is no backend, and the facilitator cannot see it. Participants take their work away with the Print or save as PDF and Download my answers buttons in the workbook sidebar.

Rebuilding

The site is generated. The generators, the day content and the deck slides live in the delivery team's project folder (11- Website 2.0/), not here. This repository is the deploy target.

Releases

Packages

Contributors

Languages