-
Notifications
You must be signed in to change notification settings - Fork 2.3k
Pull requests: openshift/release
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Run e2e-v2-aws-techpreview-osimagestream test always on presubmit
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
WIP: add openperouter deploy-verify test on AWS
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#82873
opened Aug 4, 2026 by
oribon
Contributor
Loading…
Add Prow plugin config for openshift/functions-operator
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82872
opened Aug 4, 2026 by
gauron99
Contributor
Loading…
multiarch: add openshift-e2e-libvirt-vpn-heterogeneous workflow
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#82871
opened Aug 4, 2026 by
ibm-adarsh
Contributor
•
Draft
13 tasks
multiarch: add libvirt-s390x-amd64-vpn cluster profile scaffolding
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82870
opened Aug 4, 2026 by
ibm-adarsh
Contributor
•
Draft
14 tasks
Workwaround lca pull secret sterilization
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#82869
opened Aug 4, 2026 by
shaior
Contributor
Loading…
multiarch: remove IBM Z TechPreview jobs except OCP 5.0
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82868
opened Aug 4, 2026 by
ibm-adarsh
Contributor
Loading…
2 of 3 tasks
SPLAT-2829: Add CI changes and periodic Prow job config for ci-cluste…
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#82867
opened Aug 4, 2026 by
nischawl
Contributor
Loading…
Add quay source repos to openshift-priv whitelist
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82866
opened Aug 4, 2026 by
shruti-rh
Loading…
2 tasks
step-registry/tls-scanner: split CPU/memory into request and limit
#82865
opened Aug 4, 2026 by
machine424
Contributor
Loading…
Inject AWS IAM SetSecurityGroups perm on upgrades to 4.23
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#82862
opened Aug 4, 2026 by
mfbonfigli
Contributor
Loading…
[WIP] MULTIARCH-6017: make install-analysis-multi-p-p a blocking job
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82861
opened Aug 4, 2026 by
Neha-dot-Yadav
Contributor
Loading…
CNTRLPLANE-3986: Repoint IMAGE_KUBEVIRT_CAPI_PROVIDER at quay-proxy.ci.openshift.org
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82859
opened Aug 4, 2026 by
mgencur
Contributor
Loading…
2 tasks
ROSAENG-58795 | chore: split default prcheck job for rosa-clusters-se…
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82857
opened Aug 4, 2026 by
davidleerh
Contributor
Loading…
[Debug] Study: e2-standard-4 workers + e2-standard-4 control plane for serial GCP jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#82856
opened Aug 4, 2026 by
sdodson
Member
Loading…
RHDH: promote mapt to v0.14.3 and Kubernetes 1.36
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82854
opened Aug 3, 2026 by
zdrapela
Contributor
Loading…
Set yearly cron for 39 periodic jobs with 0% pass rate (3 months)
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#82853
opened Aug 3, 2026 by
redhat-chai-bot
Contributor
Loading…
gcp: change default control-plane instance size from custom-6-16384 to custom-8-16384
#82852
opened Aug 3, 2026 by
sdodson
Member
Loading…
4 tasks
ROSAENG-1331: Add MC e2e testing workflow for SRE operators
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#82850
opened Aug 3, 2026 by
dustman9000
Member
Loading…
6 tasks
Migrate openshift-observability qe-agent to openshift-ci-prow-agents GCP project
#82849
opened Aug 3, 2026 by
redhat-chai-bot
Contributor
Loading…
NO-JIRA: changing periodics to consume 5.0 and presubmit images
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#82848
opened Aug 3, 2026 by
etmurasaki
Contributor
•
Draft
ROSAENG-14524 | chore: update the backend test image
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82847
opened Aug 3, 2026 by
marcolan018
Contributor
Loading…
establish pass gates
lgtm
Indicates that a PR is ready to be merged.
#82846
opened Aug 3, 2026 by
grokspawn
Contributor
Loading…
WIP: TRT-2827: Migrate solver and review-responder to ai-helpers plugin skills
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#82844
opened Aug 3, 2026 by
smg247
Member
Loading…
Add rhobs/observability-operator to openshift-priv whitelist
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#82842
opened Aug 3, 2026 by
jan--f
Contributor
Loading…
Previous Next
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.